It is possible now to order pre-built electricity generating E-Cat SKLep NGU plants from Leonardo Corporation. These plants are configured by Leonardo Corp. and are shipped as a completed plant, ready to operate when installed at the customer’s site. This eliminates the need for the customer to build their own large plants by configuring many individual E-Cat SKLep units.

A 1 MW plant will be delivered in a half standard size (20 feet) shipping container. A 2 MW plant will be delivered in a full size (40 feet) standard shipping container, Higher capacity plants will be delivered in multiples of these containers. The minimum size E-Cat SKLep Plant that can be ordered is 1 MW. The cost is $2500000 ($2.5 million) per MW (excluding shipping and taxes)

PLEASE NOTE: The E-Cat SKLep NGU generates DC electricity. If you choose AC output, you will need to install inverters to adapt DC output to AC. The cost of inverters is not included in this price. Leonardo Corporation can provide inverters for an additional cost, or the customer can install their own.

NO PAYMENTS are required until units are ready for shipping, however buyers of the 1MW plants have to provide proof of funds, putting the money in an escrow account. Prior to delivery, customers may test the plant at a facility of Leonardo Corporation. If the test, based on an agreed upon protocol, is successful, the escrow agent delivers to Leonardo Corp. the payment at the time of delivery. If the test is unsuccessful the escrow agent returns the money to the customer. In this way, both parties are guaranteed.

Specifications (per 1 MW Electricity output):

Size: One half size (20 ft) shipping container
Expected operational lifespan: 100 000 hours
Electricity generation: 1 MWh/h (voltage can be configured to suit customer needs)

Delivery of this product will occur only if Leonardo Corporation collects at least one million orders of the E-Cat SKLep NGU 100 W.

Click here order the E-Cat SKLep NGU Plant